Thursday, May 18, 2017

Street Maintenance, Part 1

The City has begun the work to repave my block of my street.  It began yesterday with some curb removal.  They say the project should be completed by mid-July.  I plan to take photos of the progress every couple days.  This is the beginning.

 
We are getting sidewalks on both sides of the street, which is odd since none of the other blocks have sidewalks.  Last year the City repaved another block in my neighborhood about two blocks from mine and did not put in sidewalks. You can barely see the orange stripe on the driveway in front of my car. I believe that's how far up they will redo the driveway entrance.  My veggie gardens should be far enough back from the street not to be disturbed by the sidewalk installation.
 
The forecast is for rain off and on for the next 2-3 days.  I'd like to get some newer photos of my garden beds if the sun will come out.  I'll post them when I get them.  Until then, never give up, never surrender, and may all you dreams come true.